Repair VW Sharan. Diesel engines: 1,9 l TDI.+ 1. Introduction + 2. Engine VR6 + 3. The two-litre engine (ADY) + 4. System of greasing of the engine + 5. Cooling system + 6. System of injection of fuel of engine VR6 + 7. System Simos of injection of fuel of the 2,0-litre engine + 8. Ignition system + 9. Coupling + 10. A mechanical 5-step transmission + 11. Shaft of a drive of wheels + 12. The steering hydraulic booster + 13. A forward suspension bracket + 14. A back suspension bracket + 15. Brake system + 16. An electric equipment + 17. The diesel engine + 18. System of greasing of the diesel engine + 19. System of cooling of the diesel engine - 20. The power supply system of the diesel engine and turbocharger 20.1. Safety measures at work on repair of system of injection 20.2. Diesel fuel 20.3. The fuel filter + 20.4. The fuel pump of a high pressure 20.5. Adjustment of the moment of injection 20.6. Atomizers - 20.7. Турбокомпрессор 20.7.1. Removal and installation 20.8. Candles накаливания 20.9. A radiator of forced air + Maintenance service card + Specifications and characteristics + Electroschemes |
Folksvagen Sharan/Sharan repair>> The power supply system of the diesel engine and turbocharger>> Турбокомпрессор>> Removal and installation
Removal and installation turbochargerа to be spent according to fig. 482. On fig. 481 places of joining of pipelines turbochargerа are shown, therefore on this drawing it is necessary to pay special attention at installation turbochargerа:
- Disconnect wires from АБ;
- Establish a forward part of the car on support and remove engine protection;
- Disconnect an exhaust pipe from turbochargerа (4 nuts), disconnect it on the other hand. Remove a forward exhaust pipe. Remove linings;
- Remove an air hose between an inlet collector and a junction turbochargerа with a radiator of forced air, and also a hose between the air filter and turbochargerом. These are hoses 1 and 2 (fig. 483);
- Turn away a bolt and remove a hose of enrichment of pressure of pressurisation;
- Turn away bolts of fastening and remove turbocharger.
Installation turbochargerа is carried out in sequence, return to removal process. Thus:
- Replace according to lining instructions, sealing rings, bolts, nuts etc. (the list to fig. 482 see).
- Put on and fix a hose of enrichment of pressure of pressurisation before it will be established turbocharger;
- Establish turbocharger and tighten the bolts inserted from above so that turbocharger still it was possible to move a little;
- Tighten from below a nut the moment 25 Н·м and after that tighten the bolts inserted from above the moment 35 Н·м.
- Before installation of the pipeline of a supply of oil fill with its oil;
- Establish the pipeline рециркуляции oils with a new lining and tighten the moment 25 Н·м;
- Establish a forward exhaust pipe with new linings (the moment of an inhaling of connection 25 Н·м);
- Pay attention to correctness of an arrangement of separate hoses and reliability of their installation;
- After installation turbochargerа start the engine and allow to it to work some time idling. The engine cannot be maintained at once on high turns as in this case there will be no uniform distribution of oil.
|
|